Verdo, Kew Bridge


Verdo, Kew Bridge, forms part of Brentford’s wider regeneration project, including homes, shops, restaurants, cafes and public spaces, adjacent to the new Brentford Community Stadium.

  • Location

    Brentford, West London

  • Architect

    JTP

  • Client

    Byldis / EcoWorld

  • Sector

    Residential Development

  • Expertise

    Tall Structures, Modular

  • Status

    Complete

Back To Projects

Off-site modular construction using pre-cast concrete panels reduces programme time

Initially named Capital Court, PJCE was appointed to design the precast concrete system for three residential towers of between 9 and 14-storeys, providing 253 new homes adjacent to the new Brentford Community Stadium. The system comprises a series of concrete panels forming load-bearing walls, and floor slabs. External walls consist of insulated pre-cast sandwich panels which are delivered complete with brick façade, aluminium frames and glazing.

The superstructure is a combination of a traditional reinforced concrete frame up to level 2 with a precast system above. This design takes advantage of the repetitive nature of the floor layouts and, with no need for scaffolding, the project can be completed faster and more efficiently. The pre-cast elements were completed to an average turnaround of 6 days per level.